Wayne State College Peterson Fine Arts
January 9, 2023 10:31 pmContour installed new red oak paneling and trims on the face of the existing stage in the Peterson Fine Arts building at Wayne State College. After we were done with the paneling, we had to install 12 wood louvers, wood moldings above the louvers, and a top cap and apron on the full length of the stage. On the ends of the stage, we installed paneling down the face of a ramp with a wood cap and apron. On the other side of the stage, we did the face of the stairs and installed new stair treads.
Project Manager: Adam Daws
Project Supervisor: Adam Vraspir
Contractor: Hausmann Construction
Categorised in:
This post was written by Contour Construction